- Type: Service
- Category: Computing Centre / Network
- Start: 2026-02-09T02:00:00+0000
- End: 2026-02-10T16:00:00+0000 (expected)
Due to planned work by the local power grid operator, the data center location will be temporarily operated via the emergency power supply (emergency power generators) during the above-mentioned period.
Power will be supplied by fully redundant diesel generators (at least N+1). The switch to emergency power and the return to normal operation will be controlled, gradual, and continuously monitored by the data center operator.
The data center service provider does not expect any disruption to services during the work. Nevertheless, as a precaution, we would like to point out that this is an operation outside normal conditions.
The data center operator will have additional specialist personnel on site throughout the entire measure and will provide building-specific information about the individual switch overs.
Power will be supplied by fully redundant diesel generators (at least N+1). The switch to emergency power and the return to normal operation will be controlled, gradual, and continuously monitored by the data center operator.
The data center service provider does not expect any disruption to services during the work. Nevertheless, as a precaution, we would like to point out that this is an operation outside normal conditions.
The data center operator will have additional specialist personnel on site throughout the entire measure and will provide building-specific information about the individual switch overs.