- Type: Service
- Category: Computing Centre / Network
- Start: 2026-09-02T15:00:00+0000
- End: 2026-09-03T05:00:00+0000 (expected)
On Wednesday, September 02, 2026, our data center service provider nLighten will be performing another power maintenance at the FRA4 site
between 05:00 p.m. and 07:00 a.m. (GMT+2)
We have received the following information from nLighten regarding the maintenance:
“We must switch the power supply for the existing RPPs (power
switchgear) in order to perform work on the low-voltage switchgear.
During the switchover, only one power supply will be available, resulting in reduced redundancy.
To carry out the work, one power supply must be shut down for 8 hours.”
Although deactivating individual power feeds poses a high risk, it
should not disrupt the availability of our services. To minimize
potential risks, IP-Projects is implementing the following preventive
measures:
- Visual inspection of all server systems with redundant power supplies
to ensure that both power supplies are correctly connected to the power
feeds.
- Visual inspection of the automatic transfer switches on servers that
have only one power connection - redundant power supply for MS servers.
The inspections will be conducted according to the dual-control
principle. At the time of maintenance, we will have technicians on-site
on standby to restore services as quickly as possible in the event of a
disruption.
between 05:00 p.m. and 07:00 a.m. (GMT+2)
We have received the following information from nLighten regarding the maintenance:
“We must switch the power supply for the existing RPPs (power
switchgear) in order to perform work on the low-voltage switchgear.
During the switchover, only one power supply will be available, resulting in reduced redundancy.
To carry out the work, one power supply must be shut down for 8 hours.”
Although deactivating individual power feeds poses a high risk, it
should not disrupt the availability of our services. To minimize
potential risks, IP-Projects is implementing the following preventive
measures:
- Visual inspection of all server systems with redundant power supplies
to ensure that both power supplies are correctly connected to the power
feeds.
- Visual inspection of the automatic transfer switches on servers that
have only one power connection - redundant power supply for MS servers.
The inspections will be conducted according to the dual-control
principle. At the time of maintenance, we will have technicians on-site
on standby to restore services as quickly as possible in the event of a
disruption.


Power Maintenance nLighten Datacente